   Ward Number  12 :

Sl No

Details

Rs. in Lakhs

1

Approximate Amount

7.50  Lakhs

2

Tender amount

7.50  Lakhs

3

Tender percentage of Contractors

16.37%  More

4

S R Values of current Year

5.77%  More

5

Approved Tender rate

C S R  Rate

6

Tender rate as per approval

8,20,496.00

7

Time of Period given for completion of work

90 Days

 Engineer: Lohith  , Junior Engineer, C M C Hassan

 Contractor: B P Sathish  Hassan

Construction of Road in ward no 12 Hemavathi Nagara 3 rd cross (Earth Work Photos)

Construction of  Box Drainage around the  temporary  constructyed slatter house of CMC



Sl No Unit Description Rate Amount
1 Cum KSRB 2-2.1 Earth work excavation for  foundation of Building, water supply sanitary lines and el;ectrical conducts either in plts of in trenches 1.5m and above in width in hard soil not exceeding 1.5mm in depth including dress the bottom and side of the plts and trenches stacking the excavates soil clear from edges of excavated with lead upto 50m after beoking of clods complete as per specification  No KBS 2.1(b)/2.3.5

                               1     50.00   1.20    0.65          39.00
                               1     88.00   1.70     0.85       127.16
                                                             Total      166.16
130.95/cum 17272.00
2 cum KSRB KSRB 4-2.1: Providing and laying in position plain cement concrete of  mix  1:4:8 using 40mm and down size granted granite metal machine mixed concrete laid in layers not exceeding 15 cms thick well copacted in foundation and plinth including cost of all materials labour HOM of machinary curing complete as per specofications No KBS 4:1       4:2  
             
                                  1     50.00     1.20       0.10       6.00
                                  1    88.00      1.70      0.10       14.96
                                                                     Total      20.96
2469.05/cum 51715.00
3 cum KSRB  5.2-3 Providing and construction granite/trap/basalt size stone masony in foundation cement mortar 1:6 stone hammered dressed in course not less than 20 cms high bond stones at two  m apart in each course including cost of materials labour curing complete as per specification KBS 5.1.13

                           1        50.00       0.23        0.45      5.17
                           1        50.00       0.45        0.45     10.12
                           2        88.00       0.45        0.60     47.52
                                                                       Total     62.81
                                                             
1562.50/cum 100024.00
4 cum KSRB  4.2.4: Providing and laying in  in position reinforced  cement concrete of mix 1:3:6 with 20 mm and down size traded granite metal machine mixed concrete laid in layars not exceeding 15 cms thick  vibraqted for all works in foundation plinth and ground floor level for retaining walls  return walls (any thickness) including attached plasters columns plers abutments pillars popsts struts buttersses string or lacing courses parapets  coping bed blocks anchor blocks plain window cills  fillets etc including cost of all materials labour HOM of machinary curing complete as per specifications  No KBS4.1.4.6
                                             1      50.00      0.23     0.08         0.92
                                             2      50.00      0.45     0.08         3.60
                                             2      88.00      0.56     0.08         6.33
                                             1     88.00       0.70     0.07         4.31
                                                                  Total        15.16       
2851.15/cum 43223.00
5  Sqm KSRB  15.1.3   Providing rules pointing to coursed stone masonary with cement mortar 1:3     20mm deep after nranking joints to depth of 20mm nicoly lining including cost of materials labours curing complete as per specification.
                                      2    50.00    -     0.45        52.20
                                      2    50.00    -     0.65      114.40
                                                               Total      166.10                    
     
37.73/sqm 6285.00
6 cum Transporting the excavated earth soil up to Km and loading lifting and others
  Qty of the item  no(1)                   166.16cum
@89.00/cum 6412.00
7 Miscellaneous Total 225000.00


 Works  going on under Kriya Yogane:
Ward No Work Total  Rs in Lakhs
16th ward Tar Road 7.00
17th Ward Tar Road 8.00
17 th and  18 th Deck Slab 10.00
8th ward water supply 4.50
18 th ward UGD supply 4.50
11th ward Dovelopment Work 8.50
R C Road to Bus Stand Road Pipe line work 0.80
19th ward UGD 0.70
18th and 17th ward Box Drainage 9.50
22 ward Deck and Box Drainage 1.50
22 ward Tar Road 7.7
17 th and 18th ward UGD 6.00
25th ward Tar Road 4.50
26,27 and 28 ward Tar Road 6.50
28 th ward Box Drainage 2.50
28 th ward Tar Road 9.90
30th ward Tar road 6.50
30 th ward Tar Road 4.50
31 ward Concrete Road 4.00
31 ward UGD 4.00
23 ward Tar Road 119.00
Total 231.00



Ward No 4  Kuvempu Nagara:

Ward Work:

1)In front of Abhiruchi Hotel 's  Owner House Gravels(Jelly) road construction 

       2) Box Drainage  construction  near NarasimheGowda's House.
    
ESTIMATED COST Cost In Rupees
Floor Works (Digging) 2787
Transportation of Granite and others 28424
To spread in required order 3613
Digging and Mixing 880
To arrange in order 1324
To spread Gravels 235
Water Works 3089
Water charges 662
Drainage 4125
Cement Concrete 10361
Cement Gare 35095
Cement Concrete 6233
Drainage 2751
TOTAL 100000


ward no 9: Basatti Koppal
    Construction of Drainage in Basatti Koppal   Engineer: T P Manjunath

Estimated  cost Cost in Rupees
Earth Wiork 12,042
Concrete Work 47,682
R C C Work 9000
Dambar work 20,574
Mud work 4204
Other works 3540
Total 85000


Ward No  9: Basatti Koppal

    Photos:Ward work  ss
  Construction of Concrete Road   Engineer:Paramesh Gowda
Estimated cost Cost in Rupees
Earth work 11667
Removing chappdi 6474
Concrete work 122040
Mixing work 135315
Cement concrete work 3096
others 1408
Total 2,80,000

Ward No 10 Ravindra Nagara

 1) Valve man Shed construction near Ravindra Nagara Tank
Estimated cost in Rupees 75,000
      Photos: word work p

Repair of  Gorur pump house building and painting:

        Photos: ward work s
Estimated Cost in Rupees 4.95 lakhs

Wara No. 17 and 18

Construction of Box Drainage

1 Estimated cost in Rs Rs.9.50 Lakhs
2 Tender Cost in Rs Rs 9.50 Lakhs
3

Contractor percentage             approximate       cost

Rs 18.76% (More)
4 S R Value 11.83%(More)
5 Approver tender value CSR rate
6 Tender amount Rs. 996036.00
7 Estimated Time 60 Days

  

Ward no 23: Shariff colony,B M Road west,work shop Area:

   1) Construction of temporaray Fish market adjacent to C M C:
 
Estimated Cost in Rupees 4.80 lakhs
          Photos: ward work m

      ward no. 27: Vallabhabhai Road:

      Construction of concrete road in 27th ward 4th cross near Shivaji House to infront
       of Rammandira

       Contractor   T Anand
         Photo: ward work  m
      
Estimated Cost In Ruoees 1,75,000Lakhs

 Ward No  8   R. C Road:

       Ward Work:

       1) Drainage and Deck construction wok near Ranganatha Floor Mill
          Photos  :ward work p
Estimated Cost Cost in Rupees
Flooring 3742
Drainage 17133
Drainage 22502
Cement Concrete 14763
Cement Concrete 2005
R C C Work 18528
Deck slab 3797
TOTAL 100000
                                                    Managed By :  Prashanth  Asst.Engineer,