Ward Number 12 :
|
Sl No |
Details |
Rs. in
Lakhs |
|
1 |
Approximate Amount |
7.50 Lakhs |
|
2 |
Tender amount |
7.50 Lakhs |
|
3 |
Tender percentage of
Contractors |
16.37% More |
|
4 |
S R Values of current Year |
5.77% More |
|
5 |
Approved Tender rate |
C S R Rate |
|
6 |
Tender rate as per approval |
8,20,496.00 |
|
7 |
Time of Period given for
completion of work |
90 Days |
Engineer: Lohith , Junior Engineer, C M C Hassan
Contractor: B P Sathish Hassan
Construction of Road in ward
no 12 Hemavathi Nagara 3 rd cross (Earth Work Photos)
  
 
Construction of Box Drainage around the temporary constructyed slatter house of CMC
| Sl No |
Unit |
Description |
Rate |
Amount |
| 1 |
Cum |
KSRB 2-2.1 Earth work
excavation for foundation of Building, water supply sanitary
lines and el;ectrical conducts either in plts of in trenches 1.5m and
above in width in hard soil not exceeding 1.5mm in depth including
dress the bottom and side of the plts and trenches stacking the
excavates soil clear from edges of excavated with lead upto 50m after
beoking of clods complete as per specification No KBS 2.1(b)/2.3.5
1 50.00
1.20 0.65 39.00
1 88.00
1.70 0.85 127.16
Total 166.16 |
130.95/cum |
17272.00 |
| 2 |
cum |
KSRB KSRB 4-2.1: Providing
and laying in position plain cement concrete of mix 1:4:8
using 40mm and down size granted granite metal machine mixed concrete
laid in layers not exceeding 15 cms thick well copacted in foundation
and plinth including cost of all materials labour HOM of machinary
curing complete as per specofications No KBS 4:1
4:2
1 50.00
1.20 0.10 6.00
1
88.00 1.70 0.10
14.96
Total 20.96 |
2469.05/cum |
51715.00 |
| 3 |
cum |
KSRB 5.2-3 Providing
and construction granite/trap/basalt size stone masony in foundation
cement mortar 1:6 stone hammered dressed in course not less than 20 cms
high bond stones at two m apart in each course including cost of
materials labour curing complete as per specification KBS 5.1.13
1 50.00
0.23 0.45
5.17
1 50.00
0.45 0.45 10.12
2 88.00
0.45 0.60 47.52
Total 62.81
|
1562.50/cum |
100024.00 |
| 4 |
cum |
KSRB 4.2.4: Providing
and laying in in position reinforced cement concrete of mix
1:3:6 with 20 mm and down size traded granite metal machine mixed
concrete laid in layars not exceeding 15 cms thick vibraqted for
all works in foundation plinth and ground floor level for retaining
walls return walls (any thickness) including attached plasters
columns plers abutments pillars popsts struts buttersses string or
lacing courses parapets coping bed blocks anchor blocks plain
window cills fillets etc including cost of all materials labour
HOM of machinary curing complete as per specifications No
KBS4.1.4.6
1 50.00
0.23 0.08 0.92
2 50.00
0.45 0.08 3.60
2 88.00
0.56 0.08 6.33
1 88.00
0.70 0.07 4.31
Total 15.16
|
2851.15/cum |
43223.00 |
| 5 |
Sqm |
KSRB 15.1.3
Providing rules pointing to coursed stone masonary with cement mortar
1:3 20mm deep after nranking joints to depth of 20mm
nicoly lining including cost of materials labours curing complete as
per specification.
2
50.00 - 0.45
52.20
2
50.00 - 0.65 114.40
Total 166.10
|
37.73/sqm |
6285.00 |
| 6 |
cum |
Transporting the excavated earth soil up to Km and loading lifting and others
Qty of the item no(1) 166.16cum |
@89.00/cum |
6412.00 |
| 7 |
|
Miscellaneous |
Total |
225000.00 |
Works going on under Kriya Yogane:
| Ward No |
Work |
Total Rs in Lakhs
|
| 16th ward |
Tar Road |
7.00 |
| 17th Ward |
Tar Road |
8.00 |
| 17 th and 18 th |
Deck Slab |
10.00 |
| 8th ward |
water supply |
4.50 |
| 18 th ward |
UGD supply |
4.50 |
| 11th ward |
Dovelopment Work |
8.50 |
| R C Road to Bus Stand Road |
Pipe line work |
0.80 |
| 19th ward |
UGD |
0.70 |
| 18th and 17th ward |
Box Drainage |
9.50 |
| 22 ward |
Deck and Box Drainage |
1.50 |
| 22 ward |
Tar Road |
7.7 |
| 17 th and 18th ward |
UGD |
6.00 |
| 25th ward |
Tar Road |
4.50 |
| 26,27 and 28 ward |
Tar Road |
6.50 |
| 28 th ward |
Box Drainage |
2.50 |
| 28 th ward |
Tar Road |
9.90 |
| 30th ward |
Tar road |
6.50 |
| 30 th ward |
Tar Road |
4.50 |
| 31 ward |
Concrete Road |
4.00 |
| 31 ward |
UGD |
4.00 |
| 23 ward |
Tar Road |
119.00 |
| Total |
|
231.00 |
Ward No 4 Kuvempu Nagara:
Ward Work:
1)In front of Abhiruchi Hotel 's Owner House Gravels(Jelly) road construction
2) Box Drainage construction near NarasimheGowda's House.
| ESTIMATED COST |
Cost In Rupees |
| Floor Works (Digging) |
2787 |
| Transportation of Granite and others |
28424 |
| To spread in required order |
3613 |
| Digging and Mixing |
880 |
| To arrange in order |
1324 |
| To spread Gravels |
235 |
| Water Works |
3089 |
| Water charges |
662 |
| Drainage |
4125 |
| Cement Concrete |
10361 |
| Cement Gare |
35095 |
| Cement Concrete |
6233 |
| Drainage |
2751 |
| TOTAL |
100000 |
ward no 9: Basatti Koppal
Construction of Drainage in Basatti Koppal Engineer: T P Manjunath
| Estimated cost |
Cost in Rupees |
| Earth Wiork |
12,042 |
| Concrete Work |
47,682 |
| R C C Work |
9000 |
| Dambar work |
20,574 |
| Mud work |
4204 |
| Other works |
3540 |
| Total |
85000 |
Ward No 9: Basatti Koppal
Photos:Ward work ss
Construction of Concrete Road Engineer:Paramesh Gowda
| Estimated cost |
Cost in Rupees |
| Earth work |
11667 |
| Removing chappdi |
6474 |
| Concrete work |
122040 |
| Mixing work |
135315 |
| Cement concrete work |
3096 |
| others |
1408 |
| Total |
2,80,000 |
Ward No 10 Ravindra Nagara
1) Valve man Shed construction near Ravindra Nagara Tank
| Estimated cost in Rupees |
75,000 |
Photos: word work p
Repair of Gorur pump house building and painting:
Photos: ward work s
| Estimated Cost in Rupees |
4.95 lakhs |
Wara No. 17 and 18
Construction of Box Drainage
| 1 |
Estimated cost in Rs |
Rs.9.50 Lakhs |
| 2 |
Tender Cost in Rs |
Rs 9.50 Lakhs |
| 3 |
Contractor percentage
approximate cost |
Rs 18.76% (More) |
| 4 |
S R Value |
11.83%(More) |
| 5 |
Approver tender value |
CSR rate |
| 6 |
Tender amount |
Rs. 996036.00 |
| 7 |
Estimated Time |
60 Days |
Ward no 23: Shariff colony,B M Road west,work shop Area:
1) Construction of temporaray Fish market adjacent to C M C:
| Estimated Cost in Rupees |
4.80 lakhs |
Photos: ward work m
ward no. 27: Vallabhabhai Road:
Construction of concrete road in 27th ward 4th cross near Shivaji House to infront
of Rammandira
Contractor T Anand
Photo: ward work m
| Estimated Cost In Ruoees |
1,75,000Lakhs |
Ward No 8 R. C Road:
Ward Work:
1) Drainage and Deck construction wok near Ranganatha Floor Mill
Photos :ward work p
| Estimated Cost |
Cost in Rupees |
| Flooring |
3742 |
| Drainage |
17133 |
| Drainage |
22502 |
| Cement Concrete |
14763 |
| Cement Concrete |
2005 |
| R C C Work |
18528 |
| Deck slab |
3797 |
| TOTAL |
100000 |
|