Hassan is the Head quarters
of the district by
the same name. It
is located at
NH 48, 196
Km west of Progress on the ISWM action plan Hassan city has 35 wards out of which 20 wards are outsourced for street sweeping. Total quantity of waste generated in a day is 58 tones out of which 28.5 ton is organic waste, 25 ton is inorganic waste and 4.5 ton is Recyclables.
FEC campaign as SWM been taken up by NGO to bring the
awareness among citizens, to ensure community participate in the waste
segregation waste shall be segregated into biodegradable
,non-biodegradable and hag and of wards before primary collection.
The waste has to be segregated into 2 topics Wet waste
includes Food waste decomposable waste etc., and Dye waste includes
recyclables.
The primary waste
collection is to be taken under two heads.
1.
Street Sweeping:
Street sweeping will
include cleaning of
silt
No of
house holds in the city : 30,777 nos
Slum House Holds
: 6295 Non Slum nonscholds : 24482
Number of Auto tripper required in non slum households
management
:
15
Waste collection in bulk generating area : The same
primary collection vehicle will
collect
the waste from Hotels and
chalices by collection near change or glide them to make this own
management Waste collection in slum Area(Bring in system) : The number of slum 12
Number
of HDPE Bins received
: 315
Type of primary collection
vehicle is penchant. Number of penchant
Debris
clearance: This function is monitoring by CMC staff with task force
2. Sccondary
Storage
:
In this action plan waste
is stored at 2 levels
1)
Source Level: At
source level individuals are expected to maintain bins for wet and
another for dry waste and hazardous waste can be
stored in a covered. It should be given to collection
vehicle.
2) Storage
at community level:
Total quantity of waste generated is 58
tons
per
day out of which 47.5 tons is wet waste
.As per field experience the
number of
secondary storage contains required are 30 numbers for
3 meter cube and 30 numbers for 4.5 meter cube capacity.
3 Transportation
of waste:
Number of dumper plates required
5 no.
Number of tractors tailors required
2 numbers The
secondary storage convinces is proposed to transport using
4) Land
filling shall be voidances as the last step in the waste processing
The Hassan CMC has purchased 22.5 acres services number
19/1 of land for
processing and disposal of solid waste
generated by the city near Agile
which is about 8 Kms from city centre.
The disposal process of various
types of waste
:
Wet waste
Composting
Dry waste
Filling to low leveling areas
Recyclable Out
sourced
Site from Drains
Filling to low leveling areas
Street sweeping waste
Filling to low leveling areas
Construction waste Filling to low leveling
areas
IEC activity
carried out in the ULB during the year:
IEC Activity carried out
in the ULB During the year :September
2005 to August 2006
September 2006 to December 2006
to Till Date.
IEC campaign as SWM has been taken up by NGO
which is being
outsourced to
|
|||||||||||||||||||
|
Managed By : Lakshmeesh Environmental Engineer No. 233702 |
|||||||||||||||||||